BUILDING AUTOMATION

BUILD LEADERSHIP WITH SCADA

USE MYSCADA SOLUTION FOR SMART BUILDING CONTROL

mySCADA brings simple and effective cost savings in Building Automation area. Our visualisation offers professional and reliable solution that ensures real time data monitoring and analysis. How to optimise energy consumption of the building in practice? Look at our references below or try online demo of Administrative Building control:

REFERENCE 1

OFFICE CENTER

REFERENCE 2

AIRPORT COMPLEX

REFERENCE 3

POWERPLANT LEDVICE

Powerplant Ledvice is situated in Czech Republic, between the spa towns of Teplice and Bilina. The power plant was constructed in the period of 1966 – 1969, with the total power output of 640 MW.

As the service staff of the service building in power plant Ledvice experienced some unexpected failures in the existing SCADA system, they looked for a device that could be easily installed next to the current control system and support trouble-free, reliable and efficient operating and monitoring of the building. The operators requested advanced and user-friendly system visualization for display and diagnostics of actual processing and operating status. myBOX Optimum was effectively combined with the control system. All visualisation screens were created in myDESIGNER and loaded into myBOX Optimum as well as into iPads (myMOBILE) that serve as mobile touch-screen operators’ panels enabling 24/7 control of the system. The entire system can be accessed remotely via 3G/4G connection.

b

download reference

SCREENSHOTS

.